OC Diveplanner
ZH-L16C · GF 60/70 · m / bar
Deco dive
Max depth
40 m
NDL at 40 m
6 min
Bottom gas
Air
Runtime
49 min
TTS
29 min
Decompression
23 min
1st stop
9 m
CNS
7 %
OTU
22
Turn pressure
67 bar
Estimated return to equilibrium after leaving the water: 31 h 38
Profile. 40 m · 20 min
Gas. Air 21/0 · 12 L · 232 bar (Bottom)
Descent rate 20 m/min · Ascent 9 m/min · Between stops 9 m/min · Final 3 m/min · Last stop 3 m · Safety stop · NDL 3 min / 5 m · Bottom SAC 20 L/min · Deco SAC 15 L/min · Workload factor 1 · At the stop · PpO₂ ≤ 1.65 · Altitude 0 m · surface pressure 1.013 bar
Dive plan
| Phase | Depth (m) | Runtime | Time | Gas | PpO₂ |
|---|---|---|---|---|---|
| Bottom | 40 | 20 | 18 | Air | 1.05 |
| Ascent | 9 | 24 | 4 | Air | 1.05 |
| Stop | 9 | 27 | 3 | Air | 0.40 |
| Stop | 6 | 33 | 6 | Air | 0.34 |
| Stop | 3 | 48 | 14 | Air | 0.28 |
| Final | 0 | 49 | 1 | Air | 0.28 |
Gas use
| Gas | Planned SAC×WF | Start reserve | Turn | Cylinder | Need / avail. |
|---|---|---|---|---|---|
| Air bottom | 2645 L · 223 bar | 3968 L · 433 bar | 67 bar | short | 3968 / 2703 L · Short by 1265 L |
Checks
- END 40 m — recommended narcotic limit 30 m.
- Density 6.45 g/L at 40 m (limit 6.20).
- Air is short: start reserve 3968 L at 433 bar in the announced cylinder (12 L), for 232 bar available.
Training tool — Bühlmann ZH-L16C with gradient factors, stops every 3 m, configurable last stop. It is not a substitute for technical-diving training, a dive computer, or a plan agreed by the team. Always check mixes, MOD, gas and procedures before entering the water. OC Diveplanner v1.6.1.

